Taizhou Huangyan Xiongyi Plastic Mould Factory
Main products:mould,plastic mould,injection mould,moulding,moulds
Products
Contact Us
  • Contact Person : Mr. Zhu Rongjun
  • Company Name : Taizhou Huangyan Xiongyi Plastic Mould Factory
  • Tel : 86-576-84085777
  • Fax : 86-576-84085666
  • Address : Zhejiang,Taizhou,Taizhou Huangyan Houzhuang industrial zone Xiangguang Road
  • Country/Region : China
  • Zip : 318020

Plastic compote Injection mould

Plastic compote Injection mould
Product Detailed
Moulds description 1.Material:P20/3CR13/718/2316 2.Size:all kin of sizes 3.Runner:cold/hot 4.Good quality

We are Xiong yi specialized in making molding more than20 years,Here is a hint: we also

can do the products, but need to make mould at first. If you need more information,contact me by Email or Skype.

Skype:zhu.rong.jun

Gerneral mold specifications:

1.Name:hand or fance basket plastic mould

2.Steel of mould cavity&core :P20/718/2316/3CR13 etc

3.Steel of mould base :45#,50#,P20,etc

4.Nos of cavity:customized or according to the customers' requirement

5.Hardness of cavity&core:30-33HRC

6.Hardness of wear parts :30-33HRC

7.Core pulling system:motor /oil cylinder/stripping plate,angel,pin etc

8.Mould Accessories:DME/HASCO standard

9:Manufacture Process:Drawing/sample/product data --Agreement comment--Hand made sample--Design comment--Material purchase and Give product instuction--Material inspection and Mould design--Electrode process and Prorm--CNC,wire cut,EDM--Quality inspection--Finish machining cavity,core,jiggle pin--Quality inspectio--Match the moulds--Quality inspection--polishing--Quality innspection--Cautery veins,plate and Nitrification--Quality inspection--Moulds assembly --Quality inspetion --Try mould--Client approbate--Consignation/maufacture

10 Machining center: CNC milling machine -NC wire cutting -NC-EDM and so on

11 Mould life time:500000-1000000 shots,or according to the material of steel

12.Down payment:Usually 40%before we start working

13.R and D:We offer customers the drawings for products and mould structure

14.Confirmation:We send the drawings to cusomer to confirm and the customers give us some suggestions

15.Testing :Testing the mould to make sure everything is ok

16.Lead time:30-45days

17.Imported Steel ensured the  long service life of the moulds

18.Rowerful cooling system ensured the product forming speed

19.Advanced computer simulation technology is adoped to analyze mould runner designing

20.Advanced High-precision equipments,High-class R&D team,and strict quality control managment ensured ensured the mould quality

                                                                         Manufacturing     Process

1.Quote

According to sample, drawings and size, Providing a reasonable price

          ↓

2.Discussion

Mold material, cavity number, price, runner, payment and delivery time

          ↓

3.S/C Signature

Approval for all the items

          ↓

4. Advance

Pay 40% by T/T advanced

          ↓

5.Product Design Checking

We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report.

          ↓                    

5.Mould Design

We make mould design on the basis of confirmed product design, and send to customer for confirmation.

          ↓

6.Mold Tooling

We start to make mold after mold design confirmed

          ↓

7.Mold Processing

Send report to customer once each week

          ↓

8.Mold Testing

Send trial samples and try-out report to customer for confirmation

          ↓

9. Mold Modification

According to customer’s feedback

          ↓ 

10.Balance settlement

60% by T/T after the customer approved the trial sample before shipment

          ↓ 

11.Delivery

Delivery by sea or air. The forwarder can be designated by your side.

  

                                                                    Photos

 



Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.